Calculation of the Right Time to Run Sieve Analysis

 Calculation of the Right Time to Run Sieve Analysis


The time required to run a sieve analysis depends on factors such as the material type, particle size distribution, equipment used, and the method followed. Here's a step-by-step guide to determining the appropriate duration for sieve analysis:

1.  Standard Guidelines

  • Standards to Reference: Refer to applicable standard ASTM C136.  

2. Consider the Material Characteristics

  • Particle Size Distribution: Fine materials may require longer sieving to prevent clogging and ensure proper separation.
  • Moisture Content: Wet or sticky materials may take longer. Consider oven-drying the sample if moisture is an issue.

3. Choose the Right Sieving Equipment

  • Manual Sieving: Requires shaking by hand; the time depends on human effort and consistency.
  • Mechanical Sieving: Machines provide consistent vibration and are usually faster. Check the manufacturer's guidelines for optimal run times.

4. Perform a Preliminary Test

  • Run the sieve analysis for an initial duration (e.g., 3–5 minutes).
  • Weight the material retained on each sieve and calculate the percentage retained and passed.
  • If material transfer between sieves stops (indicating separation is complete), this is your ideal time.

5. Adjust Based on Efficiency

  • End Point Criteria: The sieving process is complete when material transfer between sieves reduces significantly, typically less than 1% by weight over 1 minute of continuous sieving. 1 min of continuous hand sieving performed as follows: Hold the individual sieve, provided with a snug-fitting pan and cover, in a slightly inclined position in one hand. Strike the side of the sieve sharply and with an upward motion against the heel of the other hand at the rate of about 150 times per minute, turn the sieve about one sixth of a revolution at intervals of about 25 strokes.

6. Account for Reproducibility

  • Perform the analysis multiple times to confirm the selected duration produces consistent results.

7. Document and Standardize

  • Record the time determined through trials and apply it consistently for similar materials.
  • Include sieving time to laboratory procedure to ensure reproducibility and compliance with standards.

 

Build Struct : Exploring Insights of Civil Engineering

Post a Comment

Previous Post Next Post