CIVIL ENGINEERING MCQ - PART : 12

 



CIVIL ENGINEERING MCQ - PART : 12 

                           

                                                    

1. Procurement cost of an equipment involves in

          (a) Cost price of the equipment              

          (b) Interest on money invested               

          (c) Taxes paid                       

          (d) Insurance cost                          

          (e) All the above                           

2. Operating cost depends mainly on     

          (a) Cost of investment and depreciation cost  

          (b) Cost of fuel and repair              

          (c) Cost of labour                  

          (d) (a) and (b)                        

          (e) (a), (b) and (c)                          

3. Hydraulic excavators are more advantages since

          (a) Additional attachments can be fitted 

          (b) Efficient hydraulic-unit              

          (c) Efficient angle of dipping          

          (d) (a) and (b)                       

          (e) (a) and (c)                        

4. This is a most popular shovel which consists of a boom, dipper stick, the bucket and the mechanism of operation. This shovel is called                         

          (a) Dipper showel                         

          (b) Drag showel                    

          (c) Clamshell                         

          (d) Hoe                                  

          (e) Drag line                          

5. Bulldozers can be used to haul materials up to

          (a) 10 m                                 

          (b) 20 m                                 

          (c) 40 m                                 

          (d) 60 m                                 

          (e) 100 m                               

6. This is primarily a device for loading or finishing earth work. This is called

          (a) Grader                   

          (b) Tractor                    

          (c) Shovel                              

          (d) Hoe                                  

          (e) None of the above          

7. Trenchers can be used to make trenches of width up to

          (a) 18 m                                 

          (b) 16 m                                 

          (c) 14 m                                 

          (d) 12 m                                 

          (e) 10 m                                 

                  

8. This dewatering system can be installed outside the zone of construction operation and drainage is affected to the depth of excavation. This method of dewatering is called

          (a) Single stage well-point             

          (b) Deep-well drainage                

          (c) Vacuum-dewatering                 

          (d) Artesian dewatering                 

          (e) Multiple-stage dewatering                 

9. When a direct electric current is passed through a saturated soil stratum, water moves towards the cathode and the water is removed at the cathode well. This method is called

          (a) Vacuum-dewatering                 

          (b) Deep-well drainage         

          (c) Electro-osmosis            

          (d) Current drainage method         

          (e) None of the above          

10. Compaction is attained by applying the mechanical force by

          (a) Rolling                              

          (b) Kneading                         

          (c) Vibrations                        

          (d) Ramming                         

          (e) Any one of above          

11. This is the simplest form of hammer, which does not use any external power.

          (a) Single acting hammer              

          (b) Double acting hammer             

          (c) Hydraulic hammer                    

          (d) Drop hammer                

          (e) Vibratory hammer                     

12. Hauling equipment are given below. Identify the wrong one 

          (a) Trucks                              

          (b) Dumpers                          

          (c) Trailers                   

          (d) Dump Trucks                   

          (e) Lift Trucks                      

13. The process of devising of a scheme for doing, making or arranging a project before the commencement of a work is called

          (a) Planning                         

          (b) Scheduling                      

          (c) Arranging                         

          (d) Streamlining                    

          (e) None of the above          

14. Consideration of the main construction activities and all the supporting elements such as labour, material, equipment and expenditure is called

          (a) Streamlining                    

          (b) Scheduling                    

          (c) Planning                          

          (d) Arranging                         

          (e) None of the above          

15. Technical planning is carried out      

          (a) To finalize design and estimate

          (b) To plan resources                    

          (c) To decide executing authority           

          (d) To foresee obstacle                  

          (e) All the above                  

16. Limitations of planning depends on  

          (a) Correct assumptions needed            

          (b) Planning is expensive              

          (c) Planning encourages false sense of activity

          (d) (a) and (b)                        

          (e) (a), (b) and (c)                 

17. Construction Schedule involves       

          (a) Number of activities and the stages  

          (b) Labour contribution         

          (c) Equipment required         

          (d) Quantity                           

          (e) All the above                  

18. The project scheduling techniques are concerned with resource

          (a) Materials                          

          (b) Equipment                       

          (c) Time                       

          (d) Labor                               

          (e) None of the above          

19. Technical scheduling can be done effectively by the methods

          (a) Bar chart                          

          (b) Milestone chart                         

          (c) Network analysis          

          (d) (a) and (b)                        

          (e) None of the above          

20. Overall economy of a project can be achieved by a thorough coordination in  

          (a) Job Layout            

          (b) Materials and Labour               

          (c) Equipment                       

          (d) (b) and (c)                        

          (e) None of the above                 

                                                